Current location:across the banks >> Pingtan Strait Bridge
  • Pingtan Strait Bridge

    Overview

    The Pingtan Strait Bridge starts from Xiaoshan, Dongpu Town, Fuqing City, crossing the Haitan Strait, passing through the North Qingyu Island and ending at Pingtan Nianggong. The total length of the project route is 4,759.92 meters, of which the total length of the bridge is 3510 meters. The road is 1465.92 meters. The project is constructed in two-way two-lane, with a bridge deck width of 17 meters, a design speed of 80 km/h, and a navigation standard of 5,000-ton sea-going.

  • Cross-strait submarine tunnels should not be a dream

    The Fujian Provincial Development and Reform Commission has already recommended to the National Development and Reform Commission that it hopes to accelerate the preliminary work of the Taiwan Strait Tunnel and realize the long-term desire for land transportation to reach Taiwan in half an hour. According to the plan, the tunnel connecting Fujian Pingtan to Hsinchu, Taiwan, "if optimistic estimates, it is expected to be completed by 2020." Zhang Chunxian, Minister of Communications, also said in Beijing that the Ministry of Communications has planned the highway from Beijing to Taipei. The Taiwan Channel Tunnel will be part of the expressway.

copyright© 2019 Department of Transportation Information Engineering, Guangxi CommunicationsVocational and Technical College Computer Application Technology Kaisheng Guan,Tiande Zhuo,Haiming Chen,Caiyan Wang,Zhenyu Huang

All Rights Reservd.